Saturday, 21 July 2012

Oracle Apps Engineering Change Order (ECO) Material Download

Oracle Apps Engineering Change Order (ECO) Material Download


Approving and Implementing an Engineering Change Order (ECO)
    • Outline the ECO Life Cycle.
    • Approve an ECO using an Approval Workflow.
    • Approve an ECO Manually with an Approval List.
    • Auto-Schedule an ECO for Implementation.
    • Manually Implement an ECO.        
Download the material

1 comment:

  1. Hi Krishna,
    Can you share the material, as the link in your post is not working.

    ReplyDelete